The new link is up and ping. We will do a test.
The link was mounted and we pass up the traffic. All in all, we have 4x10G towards Orange AS3215
A migration of 2x10G at Global Switch are expected on Monday during the day. We will disconnect the 2x10G of a router in order to connect it on another one and move to channel port.
Done. http://status.ovh.net/?do=details&id=243
Powered by Flyspray OVH RSS
The new link is up and ping.
We will do a test.
The link was mounted and we pass up the traffic.
All in all, we have 4x10G towards Orange AS3215
A migration of 2x10G at Global Switch are expected on Monday
during the day. We will disconnect the 2x10G of a router in
order to connect it on another one and move to channel port.
Done.
http://status.ovh.net/?do=details&id=243